At €18,500, no simulated scenario lost money, so this quote carries no modeled risk of loss.
No risk
Model recommendation

Loss risk is low, but this price only reaches your 15% target margin in 26.7% of scenarios. If that margin matters, quote nearer €18,815; otherwise this price is safe to send.

  • Expected total cost is €15,993, leaving an expected profit of €2,508 at a 13.6% gross margin.
  • Across 10,000 simulations, 0.0% ended in a loss, with profit landing between €1,807 (P5) and €3,187 (P95).
  • The quote reaches your 15% target margin in 26.7% of scenarios.
  • Your current quote already keeps the modeled probability of loss below 5%; the risk floor is around €16,693.
  • Materials are the largest source of cost uncertainty, contributing about 78% of the variance in total cost.
AI Risk Review
A plain-English interpretation of this quote’s main risks and actions.
AI
Overall assessment

Under the assumptions entered, this quote is modeled to be profitable in every simulated scenario, with an expected profit of about €2,508 (a 13.55% margin). The main limitation is margin rather than loss risk: the 15% target is reached in only roughly 27% of modeled scenarios.

Key risk drivers
  • Materials drive approximately 78% of the modeled cost uncertainty, so material price movements have the largest effect on the outcome.
  • The expected margin of about 13.55% sits below the 15% target, leaving limited headroom if costs run toward the high end.
  • In the modeled downside (P5) scenario, profit falls to approximately €1,807.
Recommended actions
  • To better protect the 15% target margin, consider quoting nearer €18,815.
  • Confirm material supplier pricing before committing, since materials are the largest source of modeled uncertainty.
  • If the quote cannot be raised, consider variation terms that pass material price increases through to the client.
Verify before sending
  • Verify the material quantities and unit prices used in the estimate.
  • Confirm the electrician subcontractor price is fixed for the project window.